Billable Services
Facilities Operations and Development has the desire and technical expertise to perform for your department services that are not covered by POM funding. Some of these projects may require the submission of a Project Request.
Billable/Non-Billable Services Guide
Examples
- Minor renovations, conversion of space, installation and/or maintenance of specialized equipment affecting the building systems
- Repair of department equipment, such as window air conditioners, furniture, etc.
- Installation of items that require only minor modifications, such as pictures, wall brackets, wall clocks, etc.
- Fabrication of shelves and equipment, non-scheduled painting, changing ventilation equipment, adding electrical service, etc.
- Additional fire extinguishers.
Does not include operator time, which is billed separately at the Campus Service rates.*
Billing rates
| 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | |
|---|---|---|---|---|---|---|---|---|
| Skilled
Crafts Regular Overtime |
$40.25/hr $51.35/hr |
$40.25/hr $51.35/hr |
$40.25/hr $51.35/hr |
$40.25/hr $51.35/hr |
$40.25/hr $51.35/hr |
$36.60/hr $46.80/hr |
$36.60/hr $46.80/hr |
$36.60/hr $46.80/hr |
| Campus
Service Regular Overtime |
$38.10/hr $49.15/hr |
$38.10/hr $49.15/hr |
$38.10/hr $49.15/hr |
$38.10/hr $49.15/hr |
$38.10/hr $49.15/hr |
$34.80/hr $44.50/hr |
$34.80/hr $44.50/hr |
$34.80/hr $44.50/hr |
| Custodial Regular Overtime |
$28.00/hr $33.40/hr |
$28.00/hr $33.40/hr |
$28.00/hr $33.40/hr |
$28.00/hr $33.40/hr |
$28.00/hr $33.40/hr |
$25.65/hr $32.40/hr |
$25.65/hr $32.40/hr |
$25.65/hr $32.40/hr |
|
Consultant Regular Overtime |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
| Solid Waste Truck* (hourly) | $112.00/hr | $112.00/hr | $112.00/hr | $112.00/hr | $112.00/hr | $112.00/hr | $112.00/hr | $112.00/hr |
| Solid Waste Pick-up | $29/stop | $29/stop | $29/stop | |||||
| Vac Truck* | $75/hr | $75/hr | $75/hr | $75/hr | $75/hr | $75/hr | $75/hr | $75/hr |
| Large Dump Truck* | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr |
| Landscape Truck* | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr |
| Moving Services can be arranged when in conjunction with capital projects. | Call for a quote. | Call for a quote. | Call for a quote. | Call for a quote. | Call for a quote. | Call for a quote. | Call for a quote. | Call for a quote. |
| Street Sweeper* | $52.00/hr | $52.00/hr | $52.00/hr | $52.00/hr | $52.00/hr | $52.00/hr | $52.00/hr | $52.00/hr |
| Trash Disposal - Customer must dump trash at the compaction center (2566 Kenney Road - 292-0892). | $31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
$31.55 /cu.yd. |
| Dumpster - Billed at our cost. Includes delivery & pick-up/ | $82.50 /unit |
$82.50 /unit |
$82.50 /unit |
$82.50 /unit |
$82.50 /unit |
$82.50 /unit |
$82.50 /unit | $82.50
/unit |
| Mower* | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr | $30/hr |
| Design and Construction | ||||||||
| < $1M | 5.00% | 5.00% | ||||||
| $1M - $4M | 2.50% | 2.50% | ||||||
| $4M - $20M | 2.25% | 2.25% | ||||||
| $20M+ | 2.00% | 2.00% | ||||||
| Cost Estimating | $500 | $500 | ||||||
| State Project Fee | 1.50% | 1.50% | ||||||
| Special Events | ||||||||
| Sound Equipment - Includes 2 microphones & stands, 2 speakers, and 1 amplifier/mixer. Rates do not include set-up, tear-down, or operator time, which will be billed at Skilled Crafts rates. | $25.00/hr | $25.00/hr | $25.00/hr | $25.00/hr | $25.00/hr | $25.00/hr | $25.00/hr | $25.00/hr |
| Trash
Drums - 55 gallons each. Campus
Service
rates apply for delivery & set-up. up to 19 drums - 1-hour minimum charge. 20+ drums - 2-hour minimum charge. |
$2.50 ea Liners $.25 ea |
$2.50 ea Liners $.25 ea |
$2.50 ea Liners $.25 ea |
$2.50 ea Liners $.25 ea |
$2.50 ea Liners $.25 ea |
$2.50 ea |
$2.50 ea |
$2.50 ea |
| Information Planning and Design | ||||||||
| Building Drawing Archives - 1 hour minimum. | $41.10/hr | $41.10/hr | $41.10/hr | $41.10/hr | $39.85/hr | $41.10/hr | $41.10/hr | $41.10/hr |
| Campus Mapping - 1 hour minimum. | $41.10/hr | $41.10/hr | $41.10/hr | $41.10/hr | $39.85/hr | $41.10/hr | $41.10/hr | $41.10/hr |
| Utility
Marking - Call before you dig! Regular Overtime |
|
|
|
|
$39.85/hr $51.00 |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
$41.10/hr $52.00/hr |
| Radiation Safety | ||||||||
| Damaged, lost, late badge (dosimeter) | $10.00 ea | $10.00 ea | $10.00 ea | $10.00 ea | $10.00 ea | $3.62 ea | $3.62 ea | $3.62 ea |
| Genesis Ultra 36 MCP TLD badge | $1.80/mo $5.40/qtr |
$1.80/mo $5.40/qtr |
$1.80/mo $5.40/qtr |
$1.80/mo $5.40/qtr |
$1.80/mo $5.40/qtr |
$1.75/mo $5.25/qtr |
$1.75/mo $5.25/qtr |
$1.75/mo $5.25/qtr |
| Ultra or flex ring 18 badge | $2.80/mo $8.40/qtr |
$2.80/mo $8.40/qtr |
$2.80/mo $8.40/qtr |
$2.80/mo $8.40/qtr |
$2.80/mo $8.40/qtr |
$2.52/mo $7.56/qtr |
$2.52/mo $7.56/qtr |
$2.52/mo $7.56/qtr |
| 35 MCP TLD + Cr39 badge | $9/mo $12/qtr |
$9/mo $12/qtr |
$9/mo $12/qtr |
$9/mo $12/qtr |
$9/mo $12/qtr |
$7.34/mo $9.08/qtr |
$7.34/mo $9.08/qtr |
$7.34/mo $9.08/qtr |
| Badge Board small medium large |
$25 $35 $50 |
$25 $35 $50 |
$25 $35 $50 |
$25 $35 $50 |
||||
| Radioactive Waste Removal | ||||||||
| Dry Active Waste (offsite disposal) | $287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
$287.00 /cu.ft. |
| Dry Active Waste (decay) | $125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
$125.00 /cu.ft. |
| Mixed Waste | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost |
| Sealed Sources | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost | Actual Cost |
| Utilities | ||||||||
| Electric per KWh | $0.07317 | $0.0711 | $0.0658 | $0.06331 | $0.0553 | $0.055 | $0.052 | $0.052 |
| Water & Sewer per CF | $0.062224 | $0.0587 | $0.0561 | $0.05613 | $0.0533 | $0.0465 | $0.03847 | $0.03578 |
| Steam per 1,000 lb | $17.23554 | $18.05 | $19.87 | $20.62988 | $20.63 | $20.67 | $23.27 | $14.95 |
| Chillled Water per Ton Hour | $0.22203 | $0.2017 | $0.2017 | $0.20165 | $0.2188 | $0.2272 | $0.1638 | $0.16422 |
| Gas per CF | $0.00741003 | $0.00883 | $0.0105 | $0.011 | $.011 | $.011 | $.011 | Actual |
Learn about POM Funding.